*In the downtown transit tunnel, The Braid was sandblasted into the existing stone surface when the tunnel was retrofitted for the current light rail.
*In the downtown transit tunnel, The Braid was sandblasted into the existing stone surface when the tunnel was retrofitted for the current light rail.